Close

Member Login

  1. | 6 Jun 2013

    Unfair Dismissal

    The Fair Work Act 2009 (Cth) (FW Act) increases the protection for employees who have been unfairly dismissed. Who can make an unfair dismissal claim? A person can make an unfair dismissal claim if they have: completed the minimum employment period; and are covered by a modern award (or award-based transitional instrument) or an enterprise […]

  1. | 6 Jun 2013

    Tilers

    Tilers are not a Registered or licensed trade in Western Australia. Registration or Licensing is only required for builders, electricians, plumbers and painters. Tilers can obtain formal qualifications through TAFE, but many would have learned their skills “on the job” rather than be formally trained. There is a Ceramic Tilers Association to which some tillers […]

  1. | 6 Jun 2013

    Union Right of Entry

    This Fact Sheet provides information about the right of entry requirements in the Fair Work Act 2009 (Cth) (FW Act). Right of entry permits The right of entry provisions in the FW Act allow union officials who hold valid entry permits to enter employers’ businesses for certain purposes. Union officials can apply to Fair Work […]

  1. | 6 Jun 2013

    Rise and Fall Clause

    In times of volatile building costs, builders will look at ways of reducing the risk of signing “fixed price” contracts with clients, contracts which leave the builders bearing the total burden of fluctuating costs over the construction period. In the last boom, massive increases and fluctuations in the price of roof tiles, steel and copper […]

  1. | 6 Jun 2013

    Safety Management Plan (Residential)

    WorkSafe WA has introduced mandatory site-specific safety management plans for domestic construction as from 1 October 2008. Where five or more persons are working or are likely to be working simultaneously on a domestic construction site, you will need to have a site-specific occupational health and safety management plan prepared before work commences. The plan […]

  1. | 6 Jun 2013

    Site Works and Contracts

    Site costs can be a difficult element of a building contract. In most situations, builders will not specify an exact amount for site works, but will nominate a “provisional sum” or best estimate which may be adjusted up or down depending on work actually required. Under the Home Building Contracts Act a builder cannot just […]

  1. | 6 Jun 2013

    Swimming Pool Construction

    Swimming pools are extremely popular and come within the definition of “home building work” in the Home Building Contracts Act (1991). This legislation covers issues such as maximum deposit payable (6½ per cent of contract value), progress claim payments and so on. There are several construction issues to consider. When a swimming pool is constructed […]

  1. | 6 Jun 2013

    Survey Plans

    A legal survey exists for all land (lots) in Western Australia. Survey plans are the official record of the legal boundaries of land and will usually indicate the dimensions and size of a lot. Three types of legal survey plans are available from the public register and copies can be purchased online from the Western Australian Land Information […]

  1. | 6 Jun 2013

    Storm Season – Simple Strategies

    Simple strategies for the arrival of the storm season The official ‘storm season’ runs from May to October in southern WA. There is no substitute for preparation, and there is plenty that can be done to protect your home in advance. This can save you a lot of time, hassle cost in the long run if […]

  1. | 6 Jun 2013

    Security: Home Systems

    Home security systems are becoming a vital part of any residence. Crime is always on the increase, and protecting your home with a security system is becoming cheaper and much easier, with user friendly systems – even with do it yourself equipment.   There are many different systems to choose from, and many experienced and approved […]