| 6 Jun 2013 Managing Your Business
Managing Your Building Business in Changing Economic Conditions The primary causes for established businesses failing or suffering financial distress are: Lack of adequate funding Lack of an early warning reporting system on unacceptable performance Failure to recruit quality personnel Lack of contingency planning for critical situations Failure to use professional advice The following is a […]
-
| 6 Jun 2013 Lighting
Lighting can transform your new house into a home. Early planning about your lighting requirements can save a costly and inconvenient retrofit at a later stage. As part of this planning process you will need to decide about the type of lighting you require. This decision is more than thinking about whether you want downlights, […]
-
| 6 Jun 2013 Insulation Types
Loose Fill Loose fill materials include cellulose fibre and mineral wool, and is mainly used as ceiling insulation. It is simply pumped into the roof space, or sometimes the wall cavity. Since there’s no cutting, fitting or stapling it’s one of the fastest and easiest insulation types to install. Cellulose has been rated currently (by […]
-
| 6 Jun 2013 Hot Weather
Contractors should consider the benefits of developing a policy or procedure which is appropriate for their particular circumstances in anticipation of work being undertaken during hot weather. Such policies or procedures may be incorporated into negotiations for an EBA or workplace arrangement. Consultation with any Health and Safety Committee, where applicable, should also be considered. […]
-
| 6 Jun 2013 Home Finishes
Home finishes When you build or renovate, the finishing touches are the ones that make the house into a home, the personal choices made of the furniture, decorative pieces, the wall colours and floor finishes can make a stark space into a welcoming cosy room or a modern energising area. The dilemma is that there […]
-
| 6 Jun 2013 Government Tendering
The Department of Treasury and Finance oversees Tenders WA, which commenced from March 2009. The system replaced Gem Tendering, also known as the Contracting Information Bulleting Board, as the central online source of information on Western Australian public sector tenders and awarded contracts. Key functionality enhancements to the previous system include: · Automatic email notification of new tenders · […]
-
| 6 Jun 2013 Progress Payments and Disputes
Many building contracts have an agreed price for the whole of the work with payments made when the house reaches certain stages – slab, plate height, lock-up – and so on. Usually the builder makes a progress claim which needs to be settled within a specified time period or else penalties and interest can apply […]
-
| 6 Jun 2013 Preventative Maintenance
The regular repainting of timber, sealing of joints, keeping vents and pipes clear, etc. can prevent damage occurring to a property. For example: Make sure that exterior underfloor vents are not covered or clogged up; Check underfloor ventilation and for pests in the underfloor spaces; Check that water drains away from the house after heavy […]
-
| 6 Jun 2013 Painting
Giving your home a fresh coat of paint not only freshens and updates the look of your home, it also maintains the surfaces like exposed timber (veranda posts, timber windows and doors), metal and wall finishes externally and internally. Many people opt to DIY, but it you are looking to have painting work done by […]
-
| 6 Jun 2013 Minimum Conditions & The National Employment Standards
NATIONAL EMPLOYMENT STANDARDS Click here to download Fact Sheet This Fact Sheet contains information about annual leave and redundancy provisions of the Building and Construction General On-site Award 2020, which vary the minimum standards in the National Employment Standards. The redundancy pay provisions and the method of calculating annual leave in the modern award are […]