Australian and New Zealand Standard Method of Measurement of Building Works 2022 Edition
Joint Master Builders-Australian Institute of Quantity Surveyors publication providing a uniform basis for the measurement of building work.
$103.40 -
Cost Plus (CP) Contract 2019 For Housing and Commercial (Minimum Purchase 2 = 1 set)
What is it? A cost plus contract is where additional fees are charged to the owner for supervision, overheads and profit. This is usually because builder obtains material and services throughout the stages of the building process and costs are passed to the owners. There may be a component with an agreed margin to cover […]
$48.00 -
HBW for Housing (Minimum purchase: 2 = 1 set)
Lump sum contract for housing projects between $7500 and $500,000. Contracts for residential building within this price range must include conditions required by the Home Building Contracts Act. HBW 2019 complies with the Act. In keeping with common practice in the housing sector, it provides for progress claims at specific stages of the project, […]
$48.00 -
Home Buyers Construction Guide
The Guide aims to inform new home buyers about common construction concerns such as plaster cracking, glass scratches and slab cracks, with advice on whether remedial action is necessary. It is an ideal complement to standard contract documents, dealing with expectations about levels of finish and construction standards to be achieved in new homes.
$15.00 -
MWC for Commercial (Minimum purchase: 2 = 1 set)
Medium Works Contract Lump sum contract, the terms and conditions of which are in keeping with commercial sector practice. It includes conditions for retention and liquidated damages and provides for progress claims at regular intervals, rather than at stages of the project. It can be used for housing projects but strictly only where the […]
$48.00 -
PM2 Project Management Agreement (Set of 2)
Contract with the principal where the project manager assumes responsibility for controlling, managing and coordinating the project as agent for the principal. Project manager carries out construction management, but also undertakes earlier duties such as design approval, engaging consultants, arranging finance and preparation of plans.
$55.00 -
PPA 2014 – Preparation of Plans Agreement Pad
Contract which provides the owner to pay the builder for work carried out in preparation for entering the main building contract. Work could include site inspection, site survey, preparation of plans etc. Builder’s fee structure is settled up front and paid regardless of whether a building contract follows.
$30.00 -
PTC 2014 – Period Trade Contract (Set of two)
The Period Trade Contract 2014 is designed to assist contractors and subcontractors to better regulate their contractual relations where subcontractors are engaged on a periodic basis.
$48.00 -
PTC 2014 – Period Trade Contract Pack
Two copies of the Period Trade Contract 2014, plus User Guide. The Period Trade Contract is designed to assist contractors and subcontractors to better regulate their contractual relations where subcontractors are engaged on a periodic basis.
$78.00 -
PTC 2014 – Period Trade Contract User Guide
Assists in understanding the Independent Contractors Agreement.
$49.50 -
Quotation Document Pad
Simple duplicate quote forms in pad format. Provides builders details, brief description of work and total price fixed for 30 days.
$30.00 -
RBW for Housing including multi-residential (Minimum purchase: 2 = 1 set)
Residential Building Works Lump sum contract for housing projects, including multiple units, where the contract sum is more than $500,000 or more. While not required to comply with the Home Building Contracts Act, this contract is similar to much of the HBW lump sum contract. The contract is directly between builder and owner […]
$48.00 -
SHBW For Housing (Minimum Purchase: 2 = 1 set)
This is a shorter version of the HBW lump sum contract. It also complies with the Home Building Contracts Act and is suitable for small housing projects such as renovations, alterations and additions up to about $75,000. The contract is directly between builder and owner and does NOT provide for an architect or superintendent […]
$48.00 -
Site Report Forms Pad
Checklist to assist in proper assessment of provisional sum for site costs.
$30.00 -
Small Works Contract SWC 2017 (Minimum purchase: 2)
(Agreement for Small Works, 2017 Edition) Lump sum contract for small scale domestic work (up to $7500, e.g pergolas, retaining walls, paving etc.) or commercial work up to about $50,000. Not to be used for Home Building Contracts Act work (housing projects between $7500 and $500,000).
$27.00 -
Standard Specification – Brick (Minimum purchase: 3)
Standard specification for use in conjunction with drawings and building contracts in construction of predominately framed structures.
$48.00