-
| 26 Jul 2013 Australian and New Zealand Standard Method of Measurement of Building Works 2022 Edition
Joint Master Builders-Australian Institute of Quantity Surveyors publication providing a uniform basis for the measurement of building work.
-
6 Jun 2013 |Floating Floorboards
Floating floors can be installed onto a concrete pad or any other flat, firm or level surface without using nails, battens or glue. They are called “floating” because they are not attached to the sub-floor in any way. They can be fitted over most flat surfaces – tiles, concrete, cork or timber. As a result […]
-
6 Jun 2013 |Land Title Release and Contracts
Sometimes people sign a building contract and pay a deposit on a home when land title is not yet available. Delays in the processing of land title can be lengthy and with building costs increasing rapidly, so there can be contract complications and inconvenience to both parties. Under normal conditions and under most building contracts […]
-
6 Jun 2013 |Concrete Slabs – Shrinkage
Curing is a process which takes place when a concrete slab is laid. As concrete is being poured, fresh concrete is converted into a solid mass when the cementeous materials hydrate. The action taken after the slab is laid to ensure hydration is called curing. Curing is the protection of fresh concrete from evaporation. When […]
-
6 Jun 2013 |Employment and Good Faith Bargaining
Bargaining representatives must comply with various ‘good faith bargaining’ requirements when negotiating an enterprise agreement (other than a greenfields agreement). These requirements do not apply to the process of varying or terminating an enterprise agreement. The good faith bargaining requirements imposed on all bargaining representatives include: Attending and participating in meetings at reasonable times; Disclosing […]