-
| 26 Jul 2013 Australian and New Zealand Standard Method of Measurement of Building Works 2022 Edition
Joint Master Builders-Australian Institute of Quantity Surveyors publication providing a uniform basis for the measurement of building work.
-
| 26 Jul 2013 ABIC BW.SC-1 Companion Subcontract to BW-1 (Set of two)
Companion subcontract for the ABIC BW-1 2002 Basic Works Contract. Sets out the obligations of subcontractors engaged by the builder to perform work on very small projects.
-
6 Jun 2013 |Floating Floorboards
Floating floors can be installed onto a concrete pad or any other flat, firm or level surface without using nails, battens or glue. They are called “floating” because they are not attached to the sub-floor in any way. They can be fitted over most flat surfaces – tiles, concrete, cork or timber. As a result […]
-
6 Jun 2013 |Concrete Slabs – Shrinkage
Curing is a process which takes place when a concrete slab is laid. As concrete is being poured, fresh concrete is converted into a solid mass when the cementeous materials hydrate. The action taken after the slab is laid to ensure hydration is called curing. Curing is the protection of fresh concrete from evaporation. When […]